Streets to be Resurfaced Next

 The 2018 Neighborhood Street Resurfacing Program will begin in early April. Road and Bridge will notify residents of the work in advance by door hangers, flashing message signs or static message signs. When this occurs, please monitor the section below titled “Streets to be Resurfaced Next” for an updated list of streets to be resurfaced the next two days.

 PLEASE CHECK BACK FOR WEATHER DELAYS 

The following streets are scheduled to be resurfaced or swept next:

 Resurfacing Date

 Neighborhood

 Street

 Treatment

 No further schedued neighborhood roads

   Updated  8/7/2018

 
On your resurfacing day

To help us provide a quality product, please do not park vehicles on the street between 9:00 am and 3:00 pm and do not run your sprinklers on your designated resurfacing day.

For seal coat, please drive slowly for a couple of weeks while the asphalt cures.

For fog seal, please and do not drive on the new surface for approximately 2-3 hours after it is applied. Temperature, humidity and cloud cover may increase curing time.   

The Williamson County Road and Bridge Department will notify residents in advance of the work by door hangers, flashing message signs, or static message signs. If your subdivision is receiving door hangers, you can expect to receive a green door hanger approximately 2 weeks in advance of the work and an orange door hanger approximately 2-3 days in advance. If your subdivision is receiving a flashing message board, the message board will be placed approximately a week in advance of the work. After receiving advance notification, please check this page to see if your street is scheduled for the next two days of work.

 
2018 Tentative Resurfacing Schedule

Below is the tentative 2018 Neighborhood Street Resurfacing Program Schedule. Click here to see if your street will be resurfaced in the next two days.

The Resurfacing Program Schedule is currently being developed and will be posted as it becomes available.

        Neighborhood

             Seal Coat

             Fog Seal

               (Cul-de-sacs only)

Cimarron Hills                                       

 Mid-May                                                         

 Fall or early Winter                                

Forest Creek

 Early April

 Fall or early Winter

Saratoga Springs

 Late July

 Fall or early Winter

Huntington Trails

 Mid-April

 Fall or early Winter

Morningside Meadows

 Early May

 Fall or early Winter

Silver Leaf

 Late April

 Fall or early Winter

Post Oak Ranch

 Late June

 Fall or early Winter

Bear Creek Ranch

 Mid-July

 Fall or early Winter

Stable Oaks

 Mid-July

 Fall or early Winter

Sunrise Acres

 Mid-July

 Fall or early Winter

Big Valley

 Late July

 Fall or early Winter

Farris Ranch

 Late July

 Fall or early Winter

Whisper Wood

 Late August

 Fall or early Winter

Mesa Vista Estates

 Late June

 Fall or early Winter

Baker Estates

 Late June

 Fall or early Winter

Silver Creek Ranch

 Late June

 Fall or early Winter

Western Hill Estates

 Late April

 Fall or early Winter

McShepherd Ranches

 Mid-April

 Fall or early Winter

Wild Country Ranch

 Early July

 Fall or early Winter

San Gabriel Oaks

 Early July

 Fall or early Winter

Brushy Creek North

 NA   Late May
Great Oaks  NA  Late May

Spanish Oak Terrace

 NA  Late May
Brushy Creek  NA  Early May
Brushy Creek Village  NA  Mid-May
Oak Brook  NA  Mid-May
Meadows of Brushy Creek  NA  Mid-May
Woods of Brushy Creek  NA  Early June
Bobby Turner's  NA  Late April
Morningside Estates  NA  Late April

Deerfield Village

 NA  Late April
Heights at Deerfield  NA  Late April
Durham Park  NA  Early May
East View Ranchettes  NA  Early May
Gabriel Farms  NA  Early May
Gamefield  NA  Early May
Liberty Oaks  NA  Early May
Greenfields  NA   Early May

Jackie Thomison

 NA   Early May
Hilltop Estates  NA  Early May
Live Oak Park  NA  Early May
Jackrabbit  NA  Early May
Tri-View Estates  NA  Early May
Ranch at Cypress Creek  NA  Mid-April
Quarter Acres  NA  Mid-April
Red Bud Acres  NA  Early May
Woodhollow  NA   Early May
Old Oak  NA  Early May
Wildwood Country  NA  Early May
Springcreek Ranch  NA  Early May

Vista Oaks

 NA  Mid-April

West View

 NA  Early May

Wild Plum Valley

 NA  Early May

Updated: 5/4/2018

The Williamson County Road and Bridge Department will notify residents in advance of the work by door hangers, flashing message signs, or static message signs. If your subdivision is receiving door hangers, you can expect to receive a green door hanger approximately 2 weeks in advance of the work and an orange door hanger approximately 2-3 days in advance. If your subdivision is receiving a flashing message board, the message board will be placed approximately a week in advance of the work. After receiving advance notification, please check this page to see if your street is scheduled for the next two days of work.