en-USes-MX
Contact
Cedar Park Annex
Commissioner Precinct Two
350 Discovery Blvd., 
Suite 201
Cedar Park, TX 78613
Phone: (512) 260-4280
Fax: (512) 260-4284
Driving Directions
[email protected]

Kathy Pierce
Executive Assistant
(512) 260-6514 Direct Line
[email protected]
 
Commissioner Precinct Two Cynthia Long

Commissioner Cynthia LongCommissioner Long has been active in the community since moving to Williamson County in 1988. She was elected twice to the Cedar Park City Council, during which time she served as Mayor Pro-Tem, and also served on the Cedar Park Planning and Zoning Commission as well as the Round Rock Medical Center Board of Directors. Commissioner Long served on the Williamson County Metro YMCA Board and was the founding Chairman of the Twin Lakes Family YMCA. Commissioner Long was also the Vice Chairman of the Williamson County Republican Party for three years. Additionally, Commissioner Long was appointed to and currently serves on the Board of the Directors for the Cedar Park Regional Medical Center.

 
Announcements

Grand Opening for Fire Station #5

  • 10 May 2019
  • Author: bawassink
  • Number of views: 429
  • 0 Comments

Williamson County and City of Cedar Park celebrated the opening of Fire Station #5 on Friday, May 3rd with a hose uncoupling ceremony! The station will house Williamson County EMS and the Cedar Park Fire Department to handle this fast growing part of the county!

Groundbreaking for Seward Junction Improvements

  • 2 May 2019
  • Author: bawassink
  • Number of views: 543
  • 0 Comments
Groundbreaking for Seward Junction Improvements

April 30, 2019 (Williamson County, TX) – Williamson County and City of Liberty Hill officials broke ground Monday on improvements for a southern loop around Seward Junction. The project will construct a new two-lane roadway in the ultimate right-of-way for a six-lane divided facility in the future.

The project is divided into two sections. The Seward Junction Southeast project goes from US 183 at CR 259 to SH 29 at CR 266. The project was designed by Aguirre & Fields, and the contractor is Jordan Foster. The Seward Junction Southwest project goes from SH 29 at CR 213 to US 183 at CR 259. The project was designed by K Friese, and the contractor is Jordan Foster.

“The Seward Junction Improvement Project is a very significant project for the county as it will ultimately be a continuation of roads around the entire Seward Junction area,” said Precinct 2 Commissioner Cynthia Long. “As we continue to grow in the western portion of the county, it is incredibly important for alleviating traffic and for improving safety throughout the SH 29 and 183 area.”

Both sections are anticipated to be completed in early 2021.

Commissioner Cynthia Long Elected Vice-Chair of CAMPO

  • 15 February 2019
  • Author: bawassink
  • Number of views: 1067
  • 0 Comments

On Monday, Williamson County Commissioner Cynthia Long was unanimously elected by the Capital Area Metropolitan Planning Organization (CAMPO) policy board to serve as the organization’s Vice-Chair. Commissioner Long brings years of experience in transportation to the position. She has a passion for common sense transportation solutions and has championed them in Williamson County and the region. Commissioner Long has represented Williamson County on CAMPO since 2007.

CAMPO is made up of elected and citizen representatives from Bastrop, Burnet, Caldwell, Hays, Travis and Williamson counties. The organization is responsible for long range transportation planning and allocating state and federal funds to regional transportation projects.

Ribbon Cutting for Ronald Reagan Blvd. at Santa Rita Blvd.

  • 14 February 2019
  • Author: Connie Odom
  • Number of views: 1058
  • 0 Comments
Ribbon Cutting for Ronald Reagan Blvd. at Santa Rita Blvd.

Williamson County officials and representatives from Santa Rita Ranch held a ceremonial ribbon cutting to celebrate the completion of turn lanes on Ronald Reagan Boulevard to Santa Rita Boulevard on February 7. The project consisted of widening the pavement on Ronald Reagan Boulevard from approximately 1,000 feet south of Santa Rita Boulevard to 700 feet north of the intersection. Both left turn and right turn lanes were striped on Ronald Reagan Boulevard into Santa Rita Boulevard. 

Up Coming Groundbreaking for SH29 & CR 200

  • 22 October 2018
  • Author: bawassink
  • Number of views: 1815
  • 0 Comments

Intersection of CR 200 and SH 29

Williamson County will hold a groundbreaking for much needed improvements to the intersection of SH29 and CR 200 / Loop 332. The County led project includes adding dedicated right turn, left turn and through lanes on CR 200 at SH 29. A right turn lane from northbound SH29 onto CR 200, drainage improvements at the intersection, and a new traffic signal are also part of the project scope.

“Improving safety and mobility throughout the County is one of our highest priorities. These improvements will relieve the congestion and remove the bottleneck at this busy intersection” said County Commissioner, Cynthia Long. Mayor Rick Hall commented on the importance of this project to the City of Liberty Hill in the following statement, “The improvements to this intersection and the other improvements that the County is doing on CR200 will be very beneficial to Liberty Hill residents and all drivers in the area. I am thankful for the great partnership we have with Williamson County.”

The funds for the improvements are $1.1 million from Williamson County, $500,000 from the Texas Department of Transportation and $100,000 from the Liberty Hill Economic Development Corporation. O’Brien Engineering Services (now Jones/Carter) is the design engineer and Cox Commercial Construction is the contractor.

When: Monday, October 29, 2:00 p.m.
Where: SW Corner of SH29 and Loop 332
Who: Precinct Two Commissioner Cynthia Long and
TxDOT Austin Deputy District Engineer, Kevin Dickey

RSS